Construction and installation of a food retail mezzanine floor

Scope

KDM was appointed to deliver a 25-week logistics warehouse transformation project in Exeter, carried out in a live operational environment. The works focused on increasing storage capacity and operational efficiency by installing a new mezzanine floor and associated infrastructure, while maintaining safe access and minimising disruption to day-to-day operations.

Scope of Work
• Construction of a new mezzanine floor structure.
• Installation of shelving and stow-by racking systems.
• Mechanical and electrical fit-out works, including lighting and ventilation.
• Refrigeration electrical infrastructure and terminations.
• Installation of fire exit staircases.
• Formation of underdraw and upstands.
• Construction of a scaffold tunnel to maintain safe site access during works.
• Coordination of all works within a live warehouse environment.

OUR APPROACH

Delivering the project within an operational facility required detailed planning, phased delivery and a strong focus on safety. From the outset, the team implemented measures to separate construction activities from operational areas, including installing a scaffold tunnel to maintain safe pedestrian access and minimise disruption.

The team developed a phased programme to enable mezzanine construction and fit-out works to progress alongside ongoing site operations. Close coordination between structural, M&E, refrigeration, and racking contractors ensured multiple work fronts could progress simultaneously, maintaining programme momentum while adhering to strict safety and operational requirements.

RESULT

The completed works create a modern, efficient, fully operational warehouse environment that will support the client's long-term operational requirements.